Page 58 - LH_Research_Report_2020_Eng
P. 58
(Figure 32) Aerial shot of Area 48, Fanling/Sheung Shui
In June 2014, the Government stated
its intention to rezone the site for public
housing. Rezoning was then started in
January 2016 and was completed in
January 2017. Meanwhile, in 2015 the Civil
Engineering and Development Department
(CEDD) started site investigation and design
for supporting infrastructure for the site. The
study is still ongoing as of February 2020.
5 566

